Frederic Debackere
Frederic Debackere Design
About Us
Site analysis and constructability study, schematic design, design development, permit set, construction drawings, as-built, stormwater management, BIM
How We Got Started
Started in 2015 after being trained since 1998 and later registered with NCARB
Products & Services
Hand sketches for a split bathroom overlaid on the existing floor plan, East Hampton, NY
Gallery
Recommendations Given (6)
"Responsive to inquiry and easy to correspond with. "
Eugene Spiotta
Spiotta Construction management Corp
Highly Recommended
"He does excellent construction management and construction details"
Recent Activity
Lower your membership so we can all connect for a minimum symbolic amount, it will greatly help all small businesses. Just do it!!
(more)
Lower your membership so we can all connect for a minimum symbolic amount, it will greatly help all small businesses. Just do it!!
The roofing membrane has been improperly installed according to the building code. The subsurface is not flat, the drainage is not considered. Also flashings are missing at roof penetrations and parapet. Fixing this roof at this point can only lead to more leakage, it should be removed with the...
(more)
The roofing membrane has been improperly installed according to the building code. The subsurface is not flat, the drainage is not considered. Also flashings are missing at roof penetrations and parapet. Fixing this roof at this point can only lead to more leakage, it should be removed with the underlayment, re-designed with pitched subsurface to leaders or scuppers and re-surfaced with EPDM and flashing at all penetration and parapet. Flashing has to be designed and installed according to the standard of practice. Water run off should not sit on roof in any puddle or cavities, it should always flow out of the roof into downspouts...
A bottle of wine or champagne
(more)
A bottle of wine or champagne