Budgeting
Answer
•
Jimmy Mauldin
from Central Oregon Heating & Cooling
The right way would to let a licensed and bonded company take the plans and do a load calculation on the structure. This will ensure that the right size of equipment will be quoted for the structure.
(more)
100 Comments (Show All)
2.7k Views